Construction Photos

March 2008 - October 2008

Construction/RearFacade.jpg
Start of work by Canyon Construction - 3/08

 

Construction/Boxes.JPG
Installation of reclaimed redwood front steps - from Old Sacramento Main Bridge

Construction/Boxes.JPG
New Oceanside recycled glass tile

Construction/Boxes.JPG
Recycling of project boxes

Construction/RaulRuiz.jpg
Our Canyon Construction foreman, Raul

Construction/RearFacade.jpg
Termite damage to rear facade wood

Construction/RearFacade.jpg
Removal of Rear Facade due to termite damage

Construction/RearFacade.jpg
New Kohler cast iron steel tub

Construction/RearFacade.jpg
Sample project FSC wood - used throughout

Construction/RearFacade.jpg
New layout - opening up kitchen to dining room

Construction/RearFacade.jpg
New solar sky-tube for Powder Room

Construction/RearFacade.jpg
Start of concrete pad for LifePod

Construction/RearFacade.jpg
Rear Yard solar LifePod steel framing

Construction/RearFacade.jpg
Finished LifePod steel structure

Construction/RearFacade.jpg
Insulated LifePod

Construction/RearFacade.jpg
LifePod rear - almost finished

Construction/RearFacade.jpg
LEED for Homes Checklist Review with Davis Energy Group & Green Point Rated

Construction/RearFacade.jpg
Foam insulation sprayed onto attic framing

Construction/RearFacade.jpg
Holes for blow-in of cellulose insulation

Construction/RearFacade.jpg
Cellulose insulation (made of newspaper)

Construction/RearFacade.jpg
Batt insulation in crawl space

Construction/RearFacade.jpg
Phoenix Solar Hot Water tank installed in old garage

Construction/RearFacade.jpg
New energy efficient Marvin windows

Construction/RearFacade.jpg
Marvin Window energy efficient stats

Construction/RearFacade.jpg
Re-use of existing old wood doors and hardware

Construction/RearFacade.jpg
New doors made of recycled Douglas Fir

Construction/RearFacade.jpg
New green kitchen cabinets by Silverwalker

Construction/RearFacade.jpg
Suntech solar electric panels (16 in total = 2.8 kw)

Construction/RearFacade.jpg
New electrical wiring - replacing old knob and tube

Construction/RearFacade.jpg
New Bosch energy & water efficient appliances throughout

Construction/RaulRuiz.jpg
Installation of our new Syndecrete countertops

Construction/RearFacade.jpg
New stucco for rear facade; Recycled Douglas Fir doors

BuildingDeck.jpg
Building the Deck off the Master Bedroom

Construction/RearFacade.jpg
Sample of green exterior paints by Mythic; help by colorist

FinishedPhotos/housephoto.jpg
New Exterior Paint (Mythic)

Construction/RearFacade.jpg
Painting with "green" Mythic paint

PaintingColors.jpg
Painting the kitchen (one of 27 colors)

Construction/Newradiator.jpg
Mud Room light fixture and new paint

Construction/Newradiator.jpg
Mud Room new paint color

Construction/Rainhogs.jpg
Rainhogs (water storage - rain & bathroom/showers)

Construction/Newradiator.jpg
New front stairs made from reclaimed redwood from the old Sacramento Main Bridge

Construction/Newradiator.jpg
Living Room light fixture and new radiator (before paint), wall paint color

Construction/Newradiator.jpg
Master bathroom recycled content tile (Oceanside)

Outdoorshower.jpg
New outdoor shower installation, including water capture

Construction/Rainhogs.jpg
Last Day of Construction - Sept. 2008

Construction/Rainhogs.jpg
Start of landscaping - October 2008

Construction/Rainhogs.jpg
New rear yard trees

Construction/Rainhogs.jpg
Installation of drip irrigation system (greywater fed)

Construction/RearFacade.jpg
First native landscaping tree - Vine Maple

Construction/RearFacade.jpg
Start of rear yard vegetable garden

Paverinstall.jpg
Basalite permeable paver installation

Construction/RaulRuiz.jpg
We finally moved into the new home on August 21, 2008!