| Start of work by Canyon Construction - 3/08 |
|
|

|
| Installation of reclaimed redwood front steps - from Old Sacramento Main Bridge |
|

|
| New Oceanside recycled glass tile |
|

|
| Recycling of project boxes |
|
|

|
| Our Canyon Construction foreman, Raul |
|

|
| Termite damage to rear facade wood |
|

|
| Removal of Rear Facade due to termite damage |
|

|
| New Kohler cast iron steel tub |
|

|
| Sample project FSC wood - used throughout |
|
|

|
| New layout - opening up kitchen to dining room |
|

|
| New solar sky-tube for Powder Room |
|

|
| Start of concrete pad for LifePod |
|

|
| Rear Yard solar LifePod steel framing |
|

|
| Finished LifePod steel structure |
|
|

|
| Insulated LifePod |
|

|
| LifePod rear - almost finished |
|

|
| LEED for Homes Checklist Review with Davis Energy Group & Green Point Rated |
|

|
| Foam insulation sprayed onto attic framing |
|

|
| Holes for blow-in of cellulose insulation |
|
|

|
| Cellulose insulation (made of newspaper) |
|

|
| Batt insulation in crawl space |
|

|
| Phoenix Solar Hot Water tank installed in old garage |
|

|
| New energy efficient Marvin windows |
|

|
| Marvin Window energy efficient stats |
|
|

|
| Re-use of existing old wood doors and hardware |
|

|
| New doors made of recycled Douglas Fir |
|

|
| New green kitchen cabinets by Silverwalker |
|

|
| Suntech solar electric panels (16 in total = 2.8 kw) |
|

|
| New electrical wiring - replacing old knob and tube |
|
|

|
| New Bosch energy & water efficient appliances throughout |
|

|
| Installation of our new Syndecrete countertops |
|

|
| New stucco for rear facade; Recycled Douglas Fir doors |
|

|
| Building the Deck off the Master Bedroom |
|

|
| Sample of green exterior paints by Mythic; help by colorist |
|
|

|
| New Exterior Paint (Mythic) |
|

|
| Painting with "green" Mythic paint |
|

|
| Painting the kitchen (one of 27 colors) |
|

|
| Mud Room light fixture and new paint |
|

|
| Mud Room new paint color |

|
| Rainhogs (water storage - rain & bathroom/showers) |
|
|

|
| New front stairs made from reclaimed redwood from the old Sacramento Main Bridge |
|

|
| Living Room light fixture and new radiator (before paint), wall paint color |
|

|
| Master bathroom recycled content tile (Oceanside) |
|

|
| New outdoor shower installation, including water capture |
|

|
| Last Day of Construction - Sept. 2008 |
|
|

|
| Start of landscaping - October 2008 |
|

|
| New rear yard trees |
|

|
| Installation of drip irrigation system (greywater fed) |
|

|
| First native landscaping tree - Vine Maple |
|

|
| Start of rear yard vegetable garden |
|